April 2024

Welcome to our ninth e-newsletter for local residents about the Sloane Street Future project

Work progresses along the eastern side of Sloane Street, with paving being laid and planters installed as part of the public realm improvements. RBKC and contractor FM Conway currently have five active worksites on Sloane Street:

  • Outside Louis Vuitton to outside Ermanno Scervino

  • Outside Valentino to outside The Gloucester Pub

  • Outside Cadogan Place Gardens

  • Cadogan Place to Ellis Street

  • Outside Holy Trinity Church

Meanwhile, Reach Active and Thames Water are undertaking work in three areas:

  • Thames Water is currently on-site commissioning the water main.

  • Reach Active works are being completed and backfilled outside Hermes.

  • Reach Active is waiting for works to be completed by UKPN outside Chanel.

Sloane Street Transformation

North Sloane Street

RBKC works are ongoing outside Louis Vuitton and Ermanno Scervino to install the public realm scheme. In addition, Reach Active has completed and backfilled the works outside Hermès, in preparation for FMC to take over and commence their installation.

Cadogan Place Gardens

RBKC works are ongoing outside Cadogan Place Gardens to install the planters and wider paving.

South Sloane Street

RBKC works are ongoing between Cadogan Place and Ellis Street and the final slabs are being laid to the north end of this worksite. RBKC works are temporarily on hold outside Holy Trinity Church until the Thames Water team has finished their commissioning works, which are due to be completed in May. The site will then be handed back to complete the public realm.

FM Conway 2024 Timetable

The timetable for the public realm works on the east side of Sloane Street can be found at www.sloanestreetfuture.co.uk/programme

Full plans of the completed scheme can be found at www.sloanestreetfuture.co.uk/our-vision.

Join us

At our next residents’ meeting

Thank you to those who attended the Sloane Street Residents Meeting on Tuesday 1 October to receive a project update and discuss the public realm works. Following feedback from residents, we have increased the frequency of these meetings from quarterly to every other month. These dates will be publicised through the newsletter and on our website.

The next meeting will be held on 9th December 2024, 6pm–7pm.