March 2024
Issue nine
Works continue along the East side of the street this month. RBKC and their contractor FM Conway currently have 5 active worksites on Sloane Street:
- Outside Louis Vuitton to outside Ermanno Scervino
- Opposite the Millennium Hotel
- Outside Cadogan Place Gardens
- Cadogan Place to Ellis Street
- Outside Holy Trinity Church
Reach Active has two worksites:
- Thames Water is on site carrying out the commissioning of the water main
- Programmed works ongoing
Sloane Street Transformation
North Sloane Street
RBKC works are ongoing in the worksite from outside Louis Vuitton to outside Ermanno Scervino, excavations have taken place to the south of this worksite in preparation for the installation of the Public Realm Scheme. RBKC continue to install the Public Realm Scheme to the north of this worksite. In addition, works have commenced opposite the Millennium Hotel, excavations are ongoing in preparation for the installation of the Public Realm Scheme.
Reach Active’s programmed utility lowering works are ongoing outside Bulgari to outside Hermes. Reach Active have also now commenced backfilling the northern end of this worksite.
Cadogan Place Gardens
RBKC works are ongoing outside Cadogan Place Gardens, the more southern planters have been installed along with soil and planting. The slabs have been installed around these. The planters further north in this worksite have been set out in preparation for the installation of the planter base foundations.
South Sloane Street
RBKC works to the footway outside Holy Trinity Church are largely complete, the majority of the footway has been reopened.
RBKC works are ongoing between Cadogan Place and Ellis Street, the worksite has been excavated and the planter bases have been marked out for the foundations to be installed.
Thames Water
Thames Water commissioning, managed by Reach Active, is ongoing along Sloane Street, linking side streets to the new pipeline.
FM Conway 2024 Timetable
The timetable for the public realm works on the east side of Sloane Street can be found at www.sloanestreetfuture.co.uk/programme
Full plans of the completed scheme can be found at www.sloanestreetfuture.co.uk/our-vision).
Join us
At our next residents’ meeting
Thank you to those who attended the Sloane Street Residents Meeting on Tuesday 1 October to receive a project update and discuss the public realm works. Following feedback from residents, we have increased the frequency of these meetings from quarterly to every other month. These dates will be publicised through the newsletter and on our website.
The next meeting will be held on 9th December 2024, 6pm–7pm.
To register for the meeting, please click here.
Should you be unable to join the meeting on Zoom, or if you would prefer a face-to-face meeting, we can arrange this for you. Please email Sloane.Street@fmconway.co.uk in this case.